First Article Production

Gateway to profits

hs toes wip 350w.jpg

Once the engineering has been validated via a working prototype: all the appropriate manufacturing vendors are qualified, estimates proffered and approved and a "first-article" manufacturing build is scheduled. This is what is referred to as a pilot run and the purpose is to validate the tooling and assembly protocols.

  • 10-150MHz Signal Generators ETSL 500W.jpg
  • Revo 4p1 proto run 350W.jpg