hs toes wip 350w.jpg

First Article Production

Once the engineering has been validated via a working prototype: all the appropriate manufacturing vendors are qualified, estimates proffered and approved and a "first-article" manufacturing build is scheduled. This is what is referred to as a pilot run and the purpose is to validate the tooling and assembly protocols.

Control Alt Design - Chicago
1760 Britannia Drive, Suite 8
Elgin, IL 60124

Control Alt Design - Seattle
Redmond, WA 98053

Strategic Product Development (847) 695-4050

© 2016 Control Alt Design. Please do not reproduce.